Skip to main content
NAKJM Infrastructure
A large open charging forecourt with rows of charging bays
NAKJM Infrastructure Pvt. Ltd.

Building Tomorrow,Together.

Total EPC solutions for the next generation of national infrastructure — civil, electrical and EV charging delivered by one accountable team.

0
Building since
0+
Chargers installed
0+
Sites delivered
0+
In-house engineers & crew

Trusted by the tier-1 mobility ecosystem

Clients include Tesla, VinFast, MG, Tata Passenger Electric Mobility, Jio-bp, Adani TotalEnergies, Electriva, Terra Charge, Exicom, XPulse EV Charging, V-Green, ChargZe.

The delivery system

Follow one site through the system.

Stage 01

Site Survey

Feasibility & load assessment. Every project starts on the ground. We walk the site, assess sanctioned load and grid proximity, and model the civil scope before anyone quotes a number.

Stage 02

Design

Electrical & civil engineering. Electrical and civil are engineered together — one drawing set, one tolerance chain, from earthworks to the charger handshake.

Stage 03

Civil Foundation

Earthworks & trenching. Precision pads, kerbs and trench lines set the geometry every later trade depends on. Our own civil crews cut, level and pour.

Stage 04

Electrical Installation

HT/LT works. HT/LT cabling routed, ducted and dressed by in-house electrical teams — no third-party wiring contractor in the chain.

Stage 05

Transformer & RMU

Grid integration. Transformers sited, plinthed and energised; RMUs commissioned against DISCOM requirements for a compliant, stable connection.

Stage 06

Charger Installation

Hardware-agnostic deployment. Any OEM's hardware, AC or DC, mounted and integrated to specification on a common electrical backbone.

Stage 07

Testing

Safety & diagnostics. Thermal, insulation and exact earth-resistance testing before a single vehicle plugs in. Zero-fault grid integration is the pass mark.

Stage 08

Commissioning

Handover. Sites are handed over live: chargers on the network, documentation complete, snag list at zero.

Stage 09

AMC

Preventive maintenance & O&M. 24/7 lifecycle management with rapid-response outstation maintenance and routine physical audits to keep uptime at maximum.

Explore the disciplines behind it
Our journey

We did not arrive at EV infrastructure — we built our way to it, from foundations and floorplates to the fastest-growing charging networks in the country.

2013

Founded on civil construction

NAKJM begins as a construction firm — buildings, floorplates and groundwork — and installs its first EV charger as electric mobility takes its first steps in India.

The first charger
2017

Electriva onboarded

Our first charge point operator partnership. Multi-station rollouts across Delhi NCR turn one-off installs into a repeatable delivery system.

First CPO partner
2020

Noberoker joins the roster

Through the toughest year for site work the network keeps growing — new partner, new programmes, crews fully licensed and night-shift capable.

2021

Terra Charge partnership

Terra Charge brings hub-scale programmes — five charging hubs delivered end to end, civil through commissioning.

Hub-scale delivery
2022

XPulse comes aboard

Six hubs including the Samalkha heavy-duty fleet corridor — 70+ DC fast chargers serving trucks on continuous duty cycles.

2023

300 sites delivered

The milestone that proved the model: three hundred sites executed by the same unified in-house civil and electrical teams.

300-site milestone
2024

ChargZe onboarded

Another CPO network chooses NAKJM as its execution partner, alongside a Hyderabad-based charger OEM tie-up covering supply, installation, testing and commissioning.

2025

Livanto Green, then the OEM entry

Livanto Green joins the roster, and direct OEM programmes begin: VinFast delivery hubs and dealer infrastructure, alongside Tesla Supercharger site works in Gurgaon.

Direct OEM programmes
Today

1,000+ chargers installed

More than a thousand chargers across 300+ sites — residential AC points to 250 kW hubs — delivered by a 50+ strong in-house team.

1,000+ chargers
Recognition

Master vendor status is not won on a single job — it is granted after a portfolio's worth of them.

Master Vendor Status

DLF

2022

Master Vendor Status

Ansal Group

2023

Master Vendor Status

ERA Group

2023

Charger OEM SITC Partner

Hyderabad-based OEM

2024
In their words

They took the whole envelope — civil, electrical, canopy, commissioning — and handed the site back live. We stopped chasing four vendors.

Programme leadCharge point operator, Delhi NCR
Start a project

Building the new energy era.

Send us the site, the sanctioned load and the timeline. We come back with a feasibility view and a single-contract delivery plan.

WhatsAppCall us